Mar 01, 2012

Permacast Supplies Precast L-Shapes and Culverts for Dampier Salt Pump Station

Permacast recently supplied all the precast components for Rio Tinto’s Dampier Salt Pump Station in the Pilbara region of Western Australia. All of the products needed to be designed and manufactured for the high live loads typical of the mining and resource sector. Being a tidal zone application also meant that there was a requirement for waterproofing for improved durability. While the project specification rquired epoxy coated precast products, Permacast engineered a cost saving solution using Xypex admixtures, thereby adding value to the clients project. Furthermore, all components had to be manufactured to very tight dimensional tolerances to ensure on-site constructability.

Permacast with its highly skilled team of in house design and production engineers made it a perfect fit for this technically challenging project (Permacst even assisted with the detailed design of the electrical culverts). Permacast’s technical expertise was a true assett throughout the process from design right through to manufacture and logistics.

All products were made precisely to project specific custom specifications and Permacasts massive precast facility and enviable storage capacity meant that it could easily maintain the clients lead time requirements. Yet another project of high quality precast products delivered on time and on budget by Permacast.

Permacast
Indepth Design
Menu +61 8 9525 1380
Social Social Social Social Social