When our engineers are involved at the design stage the result is a more efficient and cost-effective construction.
Gateway WA
Prestessed Concrete Bridge Planks
Gas Protection Trench Units
Horrie Miller Overpass – Wing Beams and Planks
Facia Panels and Precast Column Formwork
Bridge Parapet Panels
Client: Gateway WA
Project Period: 2013 – 2014
Project Specifications:
228No Prestressed Bridge Planks (15-24m Long)
54No L Shape Protection Walls and Cover Units
4No Post Tension Wing Beams (110T each)
578No Precast Parapet Panels
Project Details:
Wing Beams extremely complicated products requiring 3D modeling of reinforcement to ensure correctness during fabrication.
Parapets were complex shapes and very little repeatability requiring complicated steel moulding.
Storage for just in time delivery.
Class 2 finish to all products to comply with stringent project specifications.
Single pour construction –no joint/leaks.
Value adding – post tension of wing beams.
Working closely with client to resolve design changes and improve construction effeciencies.
Large amounts of cast-in items for onsite connections.