Supply of Precast and Prestressed beams and Headstocks

  • Client: DTMT
  • Project Period: October 2012 – April 2013

Project Specifications:

  • 160No Precast Beams (9-17T each)
  • 13No Precast Headstock Soffit (8-10T each)
  • 121No Prestressed Beams (11-14.5T each)

Project Details:

  • Tight dimensional tolerances to ensure on-site constructability.
  • Cast in’s for ancillary services including plates and formwork connections.
  • Designed and manufactured for high live loads.
  • Continual liason with client to ensure logistical efficiencies.